Page History
...
- High level design has been reviewed and signed off by a senior Intel engineer
- Test plan has been reviewed and signed off by a senior Intel engineer. The test plan should include performance testing, interoperability, and any feature-specific tests that may fall outside normal testing.
- Results from executing the test plan uploaded into Maloo
- Proposed revisions to the manual have been provided
- The criteria from the Patch Landing Checklist (above) Process Summary are met
Seeking Guidance
Please alert the community via the lustre-devel mailing list if you need some extra guidance in getting your patch submitted for the release.
Overview
Content Tools