  1. High level design has been reviewed and signed off by a senior Intel engineer
  2. Test plan has been reviewed and signed off by a senior Intel engineer. The test plan should include performance testing, interoperability, and any feature-specific tests that may fall outside normal testing.
  3. Results from executing the test plan uploaded into Maloo
  4. Proposed revisions to the manual have been provided
  5. The criteria from the Patch Landing Checklist (above) are met

...